Listing ID : 20855055
-
Beds
6 -
Baths
6/1 -
Garage
3 -
Structure / Lot Size
6,135 Sqft / 17400.0000 Acre -
Year
2025
Description
Incredible opportunity for a new construction residence located on a quiet established street in Preston Hollow on an oversized 100’ x 174’ interior lot. The stately elevation features antique reclaimed “Silver Fox” solid brick with a specialty German schmear finish, 10’ iron double door entry, Bevolo copper gas lanterns and Lincoln wood with aluminum clad windows. The front elevation is framed with two mature oak trees. At the entry you are greeted by a 2-story grand staircase followed by 13’ ceilings in the open concept living area with a 20’ x 10’ sliding glass wall that overlooks the expansive back yard with additional mature oak trees throughout. The kitchen includes rift and quartered white oak custom cabinetry with honed Taj Mahal Quartzite countertops - fully equipped with a Thermador appliance package. The large breakfast area enjoys floor-to-ceiling windows for extensive views of the back yard. White oak beams and an Isokern fireplace with custom mantel finish off the space. The primary bedroom includes a vaulted ceiling with oak ceiling beams. The Primary bathroom features natural marble, dual showers and white oak cabinetry with walk-in closet and hidden safe room. The floorplan includes an additional downstairs bedroom with ensuite bath, 19’ x 19’ second living area complete with wet bar and sliding glass doors and windows for additional unrestricted views to backyard. Vehicle storage is provided by an oversized 2-car garage with an adjacent single-car garage. The interior garage entry is served by mud room lockers and additional storage cabinetry. Upstairs includes 4 bedrooms, each with ensuite bath and a flex exercise, study or game room. Quality finish out details include solid white oak flooring throughout, tankless water heaters, Phylrich plumbing, Visual Comfort lighting, Riad tile and marble. Excellent location in the private school corridor within one-half block from your front door! Construction is planned for completion in Spring 2025.